Hello,
I have set Maximum bounce rate for customer group to 10.
Now when bounce rate reach 10%, campaign status goes to Blocked ?
I want to know is there a way that admin can UnBlock the campaign & resume after some time ?
Or i have to cahnge Databse table manually in campaign table status to "pause"?
Thanks
I have set Maximum bounce rate for customer group to 10.
Now when bounce rate reach 10%, campaign status goes to Blocked ?
I want to know is there a way that admin can UnBlock the campaign & resume after some time ?
Or i have to cahnge Databse table manually in campaign table status to "pause"?
Thanks