Understanding Delivery Settings

Edmund

New Member
Went through this wonderful article that twisted1919 wrote. Still trying to grasp the exact math of the delivery settings. If we use this example settings:

campaigns at once: 10
subscribers at once: 100
parallel sending: yes
campaigns in parallel: 5
subscriber batches in parallel: 3

Scenario 1:
If we send 10 campaigns concurrently, the delivery rate will be 1st 5 (1st-5th) campaigns x 100 subscribers x 3 batches = 1500 per minute, then 1500 for the 2nd 5 (6th-10th) campaigns the next minute and alternates all the way? So mathematically, each campaign sends at 300 per 2 minute, or 150 per minute?

Scenario 2:
If we send 1 campaign only with the same settings, the delivery rate will be 100 subscribers x 3 batches = 300 per minute?
 
Back
Top